Skip to product information
1 of 4

3 total reviews

Cantilever Wall Racking With Tilted Arms Industrial/ Timber/ Long Lengths Storage 750KG SWL

Cantilever Wall Racking With Tilted Arms Industrial/ Timber/ Long Lengths Storage 750KG SWL

Regular price £400.00 GBP
Regular price Sale price £400.00 GBP
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

 

Cantilever Wall Rack with Tilted Arms

These are sold as a PACK OF 2

Secure, Heavy-Duty Storage for Long-Length Materials

Maximise valuable workspace with our Cantilever Wall Rack with Tilted Arms, specifically designed to securely store longer-length materials in busy workshops, warehouses, and industrial environments.

Ideal for storing:

  • Pipes

  • Rods

  • Timber

  • Tubing

  • And other long-length products

Manufactured from tough steel upright wall struts and securely bolted to a suitable wall surface and floor, this rack provides excellent stability and strength for heavy-duty storage applications.

With a load capacity of up to 750kg (evenly distributed across all arms), this rack is built to perform in demanding environments. The tilted arm design helps prevent materials from rolling or slipping off, reducing workplace hazards and protecting both your stock and your team.

Key Features:

  • Heavy-duty steel construction

  • Wall-mounted design to maximise floor space

  • Tilted arms to prevent rolling and improve safety

  • Suitable for industrial and workshop environments

  • Load capacity up to 750kg (evenly distributed) across all arms/reinforced brace and bottom tube, which can all be used as storage 

  • Sold as Pack of 2

Strong protective plastic end caps are fitted to each arm. Installation of our wall mounted cantilever racks should be completed by a competent person. Bolts not supplied as every wall is different and requires different bolt and screws.

PLEASE SEE FULL DETAILED FABRICATION DRAWINGS FOR MEASUREMENTS.

We will contact you 24-48hrs before your order is due to be delivered to confirm your delivery date. If any delay is anticipated which will affect the delivery date of your order, we will notify you as soon as possible.

Due to natural steel finish brackets will have marks or scratches.

Will rust if not treated.

For Custom Designs Please Contact Us

 

Pallet Freight / Large Parcel Service ORDERS ONLY

You should arrange for someone to be present at your premises to receive and sign for your delivery on its expected delivery date. Where a delivery cannot be completed, your order will be returned to our factory. You are liable for the additional costs associated with any attempted redelivery.

Our products are heavy and bulky, and our transportation company requires direct road access to your delivery address. The transportation company will not move products, whether by hand, up or down stairs, by fork lift or by any other method.

You are responsible for moving the product from the delivery vehicle and into the delivery address, and you must ensure that you have sufficient manpower or equipment to handle your product. Please ensure that your premises are open to accept your delivery between the hours specified. If your premises are closed when a delivery is attempted, you may be charged a re-delivery fee. We will contact you 24-48hrs before your order is due to be delivered to confirm your delivery date. If any delay is anticipated which will affect the delivery date of your order, we will notify you as soon as possible.

View full details